Model:EP6201
Physical Parameters:
Description
Material base data(25℃,60%RH)
Mixed material Data(25℃,60%RH)
Viscosity of mixed: 650MPaS
Mixing proportion (excluding sand): 1.05
Potlife: 25min
Walking Opening time: 16hr
Overload Opening time: 3days
Recoatable time: 8hr
Operation time and temperature relation
Material physical properties after curing
Attention:
Construction prohibited when humidity is greater than 90%RH;
The material is easy to heat up and accelerate in the barrel, so the material must be dumped on the ground before starting the batch scraping construction.
User's guidance:
Mix the two ingredients strictly in proportion and stir well; Trowel construction; According to different thickness requirements;
Need to add sand powder with different orders on site to meet the requirements. For specific operation, please consult the business personnel;
In order to ensure good anti-heavy load capacity, please control the amount of coating above 0.6kg/m2.
Storage:
Ideal storage conditions is 10-35 ℃ in cool and dry place, avoid sun exposure and prevent crystallization at low temperature.