Model:EP6101
Physical Parameters:
Description
Material base data(25℃,60%RH)
Mixed material Data(25℃,60%RH)
Viscosity of mixed25℃: 500MPaS
Mixing proportion25℃ :1.0
10℃ 20℃ 30℃
40hr 25min 15min
Potlife25℃:20min
Dry time: 6hr
Hard drying time: 16hr
Recoatable time: 6hr
Operation time and temperature relation
Material physical properties after curing
Attention:
Construction prohibited when humidity is greater than 90%RH;
Ensure that the concrete reaches the maintenance standard and the moisture content is lower than 8% before construction carried out;
The concrete foundation must be polished and cleaned thoroughly before construction carried out;
The reaction is very fast, After stirring, all must be poured on the ground to prevent the heat from melting in the bucket.
User's guidance:
Mix the two ingredients strictly in proportion and stir well; short-stem roller or Trowel construction;
Coating amount controlled by 0.1-0.15kg/m2.
Storage:
Ideal storage condition is 10-35 ℃ in cool and dry place, avoid direct sunlight.