Epoxy Floor Primer

Epoxy Floor Primer

Epoxy primer
Chat Now

Product Details

Model:EP1304 

Description 

11.png

Material base data(25℃,60%RH)

22.png

Mixed material Data(25℃,60%RH)             

Viscosity of mixed25℃: 150MPaS

Mixing proportion25℃ :1.01

10℃20℃30℃

2hr60min40min

Potlife25℃: 50min                             

Dry time: 6hr

Hard drying time: 20hr

Recoatable time: 6hr

Operation time and temperature relation  

33.png

Material physical properties after curing

44.png

Attention:  

Construction prohibited when humidity is greater than 90%RH;

Ensure that the concrete reaches the maintenance standard and the moisture content is lower than 8% before construction carried out;

The concrete foundation must be polished and cleaned thoroughly before construction carried out;

The reaction is very fast, After stirring, all must be poured on the ground to prevent the heat from melting in the bucket.

User's guidance: 

Mix the two ingredients strictly in proportion and stir well; short-stem roller or Trowel construction;

Coating amount controlled by 0.1-0.15kg/m2.

Storage: 

Ideal storage condition is 10-35 ℃ in cool and dry place, avoid direct sunlight. 

 

Inquiry