Conductive Flooring

Conductive Flooring

Epoxy Conductive Primer
Chat Now

Product Details

Model:EP6105

Description 

 

 

Material base data(25℃,60%RH)

Mixed material Data(25℃,60%RH)   

Viscosity of mixed25℃: 900MPaS

Mixing proportion25℃ :1.0

10℃    20℃    30℃
60min 40min 30min

Potlife25℃: 40min                             

Dry time: 3hr

ard drying time: 20hr

Recoatable time: 20hr

Operation time and temperature relation 

Material physical properties after curing

 

Attention:  
Construction prohibited when humidity is greater than 90%RH or  temperature below 10 ℃;
High solvent content, the construction site must ensure good ventilation, operators wear gas mask and other protective equipment.

 

 

User's guidance: 
Mix the two ingredients strictly in proportion and stir well; short wool roller construction;

Coating amount controlled by 0.1-0.15kg/m2 .

 

Storage: Ideal storage condition is 10-35 ℃ in cool and dry place, avoid direct sunlight. 

 

 

 

Inquiry