Epoxy Powder Primer

Epoxy Powder Primer

Epoxy zinc powder primer-Grey
Chat Now

Product Details

Product Description:

--Model:725-H06-30.

--A quick dry two pack epoxy primer obtaining zinc powder.The content of zinc in the dry film ismore than 30%. The product has good antirust and mechanical properties.

--VOC less than 420g/L.

Intended Uses:

--For use in all above water areas.

--Protection of steel structure for petrochemical plant, chemical plant, paper mill and bridge.

Product Information:

Volume   Solids:60%±2%                  Finish/Sheen  Matt

Typical Film Thickness

50microns dry (83.3microns wet)

Theoretical   Coverage(m2/L)

12m2/L at typical   film thickness

Mix Ratio: 3.3:1(volume)10:1(weight)

Method of   Application


Airless   Spray

Recommended

Tip size   range:0.33-0.53mm

Output   pressure:≥15MPa

Air Spray

 

Tip size   range:2.0-3.0mm

Output   pressure:≥0.4MPa

Brush/Roller

For small   area only

Thinner

Not   recommended. Use only in exceptional circumstances (volume 5%).

Cleaner

HX-501

Induction   Period

5

15

25

35

30min

20min

10min

0min

Drying Information:


5

15

25

35

Touch Dry

2h

1h

40min

30min

Hard Dry

36h

24h

16h

12h

Pot Life

8h

6h

4h

3h

Overcoating Data:


5

15

25

35

Overcoated by

Min Max

Min Max

Min Max

Min Max

725-H06-21

24h 14d

20h 10d

16h 7d

12h 5d

725-H53-81

24h 14d

20h 10d

16h 7d

12h 5d

725-H42-30

---

20h 10d

16h 7d

12h 5d

Storage:

Store in cool and dry conditions,Well ventilate.Keep away from hot and fire. Shelf Life: 12 months

minimum at 25℃,Subject to re-inspection thereafter.

Pack Size:32.5kg/11.5L in 20 L container; 3.2kg/3.5L in 6L container.

Flash Point:

Part A: Greater than 31℃

Part B: Greater than 31℃

Mixed pant: Greater than 31℃

Systems and Compatibility:

Consult your Sunrui Representative for the systems best suited for the surfaces to be protected.

Surface Preparation:

All surfaces to be coated should be clean, dry and free from contamination.

★Abrasive Blast Cleaning

Abrasive blast clean to Sa2½(GB/T 8923.1-2011). If oxidation has occurred between blasting and application of 725-E47-1(A), the surface should be reblasted to the specified visual standard.

Surface defects revealed by the blast cleaning process should be ground. Filled, ortreated in the appropriate manner.

★Shop Primed Steelwork

Weld seams and damaged areas should be blast cleaned to Sa2½(GB/T8923.1-2011).

If the shop primer shows extensive or wildly scattered breakdown overall sweepblasting may be necessary.

★Repair

The areas to be repaired should be cleaned to St3(GB/T 8923.1-2011)by  mechanical method or higher level of surface prepared to Sa2.5(GB/T 8923.1-2011)by abrasive blasting. Abrade the area immediately surrounding the repair to provide a key for subsequent coating application. Overlap areas should be kept to a minimum.

Limitations:

1)  This product will not cure adequately below 5℃. For maximum performance ambient curing temperature should be above 10℃。

2)  Apply in good weather. Temperature of the surface to be coated must be least 3℃above the dew point when the humidity is lower than 85%.

3)  725-H06-30 Part A may cause some gas when the component was storage at high temperatures. Care should be taken when opening containers.

4)  725-H06-30 will react with acid or alkali solutions.The dry time and overcoating interval may change according to the environment factors.

5)  Avoiding absorb the solvent steam and paint steam for long time. Skin and eyes must avoid contacting the paint. Pay attention to ventilate and fireproof when applying.

Duty statement:

●The data in the sheet base on the information from the laboratory and practice.

●The application may exceed the control, so we only ensure our product quality.

●We own the right of the data sheet modification without informing.

 

Inquiry